UCRFS Feeder System Requirements:
In general, the Financial System Steering Committee (FSSC) classifies
feeder systems in two broad groups: those feeder systems that require
Post Audit Notification (PAN) review and those feeder systems that do
not.
Typically, feeder systems that provide the General Ledger with detail
transactions by work order will require PAN review. Feeder systems
that do not provide transaction level to the General Ledger (and have
non-General Ledger electronic or paper based methods for reviewing charges)
will not require PAN review.
|
Examples of transaction based work order systems that will require
PAN review include the following:
|
Examples of non-transaction based General Ledger charges that
will (generally) not require PAN review include the following:
|
- Physical Plant work orders.
- Communications work orders (requests for network or voice adds,
moves, and changes)
|
- Communications recurring charges (monthly charges for phones,
lines, etc.).
- Mail Room charges (metered mail, etc.).
|
Back to index...
Prior to C&C accepting and processing feeder system charges,
the FSSC will evaluate the feeder system and determine whether
or not PAN review will be required. When the FSSC makes a PAN
determination, a Journal Source (2 or 3 character code) will be
issued for the feeder system and an FTP site will be created to
place feeder system files that will be posted to the General Ledger.
C&C will create a table reflecting the FSSCs decision
concerning feeder systems and PAN review. The table will have
the following structure:
|
Fields and Possible Values:
| Application Type |
G/L Source Code |
PAN Review Required |
| Physical Plant |
PHP |
YES |
| Communications Work Orders |
CWO |
YES |
| Communications Recurring |
CRC |
NO |
| Mail Room Charges |
MRC |
NO |
|
Back to index...
Importantly, PAN review requirements may change over time. It is very
important that electronic feeder systems be designed to send transactor
information to the G/L for each debit and credit contained in the journal,
even if this functionality is not utilized during initial submission
of data to the General Ledger.
Back to index...
Requests to submit feeder system journals to UCRFS will be made to
Chuck Rowley and Bob Grant. (Andrew Cullum will provide technical support
as required.) After a technical review, these requests will be submitted
to Accounting and ultimately the FSSC for approval.
Back to index...
Journals with errors (out of balance, invalid FAU values) will be rejected
by the General Ledger (these journals will fail the General Ledger edit
check). The feeder system will be required to re-submit the entire journal
(with corrections). Feeder system "owners" will be contacted
by Accounting or UCRs Controllers office when feeder system
journals have been rejected. Feeder system owners may be given read
only access to the PeopleSoft standard journal panel to determine the
reason the journal was rejected.
Back to index...
As a general goal, all feeder systems should strive to allow users
to specify a General Ledger "Full Accounting Unit" (FAU) distribution
for each expense line in the work order. While this will not be possible
for many feeder systems, most feeder systems should allow users to specify
multiple FAU distributions per work order.
When data from these systems is submitted to the General Ledger, charges
should be summarized as follows:
- Transactions, Work Order Based Feeder Systems:
- Charges should be summarized by work order and by unique
FAU combination within the work order. In other words, one
General Ledger line per work order for each unique FAU combination
within the work order.
- Non-Transaction, non-Work Order Based Feeder Systems:
- Charges should be summarized by unique FAU combination for the
period. For example, 10 telephone equipment charges, for a given
activity and a given month, could be summarized into a single
General Ledger line if the FAU distribution were the same for
all the equipment charges.
Back to index...
There are four fields used in the General Ledger journal process that
deserve special mention. The use of three of these fields will vary
depending on the type of feeder system submitting the General Ledger
journal. The four fields are as follows: Journal Header Description,
Journal Line Reference, Journal Line Description, and Transactor.
Back to index...
- Journal Header Description.
- This is a 254 character field that describes the journal. The
Journal Header Description should specify the department generating
the charges, the billing period, a descriptive overview of the journal,
and any other pertinent data.
- Journal Line Reference.
- This is a 10 character field that should be used to record the
feeder system work order number. The use of the Journal
Line Reference in this manner will allow users to "tie"
General Ledger charges back to feeder system work orders.
- Journal Line Description.
- This is a 30 character field that should be used to describe the
work order (at an overview or summary level). For example, the Physical
Plant work order system has a field for Order Description. The contents
of this field might be "Remodel Client Server Programmer Offices",
"Keys for Client Server Staff", or "Air Conditioning
Service for Client Server Administrative Offices". If the feeder
system description is longer than 30 characters, it should simply
be truncated prior to submission to the General Ledger.
- Transactor.
- This is an 8 character field that should be used to record the
Alpha username of the individual that requested the service (that
in turn is generating feeder system charges). While this username
DOES NOT have to be a valid PeopleSoft operator ID, the username
must be a valid Alpha username. Since e-mail is such a central aspect
of the new financial system, feeder systems must provide the General
Ledger with transactor usernames that can be used to generate valid
e-mail messages.
Back to index...
- Journal Header Description (same use as Transaction Based Feeder Systems).
- This is a 254 character field that describes the journal. The
Journal Header Description should specify the department generating
the charges, the billing period, a descriptive overview of the journal,
and any other pertinent data.
- Journal Line Reference.
- This field may be optionally used at the discretion of the feeder
system submitting the General Ledger charges.
- Journal Line Description.
- This is a 30 character field that should be used to describe the
service at an overview or summary level. For example, for recurring
Communications charges and toll charges, the Communications feeder
system might submit "Comm Equip, Line, & Tolls".
- Transactor.
- This 8 character field will currently not be used with
non-transaction, non-work order based feeder systems.
Back to index...
All feeder system G/L journals must be balanced before the journals
will pass the PeopleSoft edit check. Therefore, feeder system journals
must contain one or more revenue lines. The following notes apply to
revenue lines within feeder system journals:
- Debit (expense) entries should be POSITIVE and credit (revenue) entries
should be NEGATIVE.
- Feeder system revenues should be summarized by unique FAU combinations
(in other words, multiple feeder system revenue entries with the same
FAU information will be posted to the General Ledger on ONE journal
line).
- The Journal Line Reference may optionally be used for revenue lines
entries for both transaction based and non-transaction based feeder
system journals.
- The Journal Line Description should provide some pertinent information
concerning the revenue journal line.
- A transactor is required for "revenue journal lines" for
work order based feeder systems. PLEASE NOTE: the transactor information
for revenue journal lines must be "hard coded" in the extract
program or be selected from a table. Why? Work orders from end users
will only contain transactor information for the debit (expense) journal
lines. Feeder system owners will be responsible for naming transactors
for the revenue journal lines contained in their PeopleSoft journals.
Please see the following note on "Default Transactors".
Back to index...
As stated earlier in this document, transactor information is NOT REQUIRED
for non-work order based feeder systems. However, this requirement may
change in the years ahead. If the requirement does change, "default
transactors" will be required on an activity-by-activity basis
for each non-work order based feeder system. Hopefully, this transactor
information would be table based and merged with billing data upon submission
to the General Ledger. For example, Communications recurring billing
is a non-work order based feeder system. If transactor information were
required for this feeder system in the future, departments would be
required to establish default transactors for this feeder system (e.g.
Sally Avila for Computing). Upon submission to the General Ledger, the
Communications system would associate Sally Avila with the debit lines
for Computing contained in the Communications recurring billing General
Ledger submission.
Back to index...
Journal Header
- Source. (2 or 3 character field from FSSC.)
- Date. (Date of feeder system extract that will be used as the Journal
Header reference.)
- Description. (See above.)
- Journal Date. (Used to determine FY and Period to Post: 1 to 12, 1
= July, 2 = August, etc.)
Journal Line
- Account. (Please see Feeder System Requirements for details on FAU
submission.)
- Activity.
- Fund.
- Function.
- Cost Center.
- Project Code Department.
- Journal Line Reference. (See above.)
- Journal Line Description. (See above.)
- Amount.
- Transactor. (See above, field is Operator ID in PeopleSoft.)
Back to index...
UCRFS Feeder System File Requirements
- Financial
Filename: Three (3) character Source concatenated with an eight digit
date (MMDDYYYY) and a variable length user defined sequence number.
The date will be the date the file was produced. The file extension
will be "txt". Example: File submitted by Physical Plant on
February 24, 2000, sequence number 49 would have the filename "php0224200049.txt".
If you want to replace a file before it has been processed, submit
a new file with the same name. If you want to submit an additional file
on the same day, the file should have a different sequence number.
File will be ASCII type and transferred via FTP as ASCII.
All dates will be in the format MMDDYYYY with leading zeros. Example:
02032000
All fields except the Amount field will be left justified. Carriage
return and line feed characters are NOT allowed within the data fields.
The Amount field will be right justified. The negative sign must immediately
precede the leading digit. Example: -89.01
The Journal Header record must be followed by its corresponding Journal
Line records. The first field of the Journal Header record is a delimiter
field and must contain the value "H". The first field of the
Journal Line record is a delimiter field and must contain the value
"L".
Back to index...
| Journal Header |
Journal Line
|
| Positions |
Length |
Field Name |
Comments |
| 1 |
1 |
1 |
Delimiter |
H (Must contain the value "H") |
| 2 |
4 |
3 |
Source |
|
| 5 |
12 |
8 |
Extract Date |
|
| 13 |
13 |
1 |
Type Entry |
(Currently not used.) |
| 14 |
14 |
1 |
Adjusting Entry |
(Currently not used.) |
| 15 |
22 |
8 |
Journal Date |
(Used to derive Posting Period Derived;
7/31 = Period 1) |
| 23 |
276 |
254 |
Descr254 |
(See notes below) |
Notes:
- All fields values are mandatory except as noted.
- Journal Date will be used to post the journal to the appropriate
budget year and accounting period. Example: A journal date of
08032000 will be posted to the budget year 2001, accounting
period 2.
|
| Positions |
Length |
Field Name |
Comments |
| 1 |
1 |
1 |
Delimiter |
L (Must contain the value
"L") |
| 2 |
7 |
6 |
Account |
|
| 8 |
17 |
10 |
Activity |
(6 characters currently used.) |
| 18 |
22 |
5 |
Fund Code |
|
| 23 |
27 |
5 |
Function |
(2 characters currently used.) |
| 28 |
32 |
5 |
Cost Center |
Optional |
| 33 |
47 |
15 |
Project Code |
Optional (5 characters currently
used.) |
| 48 |
49 |
2 |
Project Code Corporate |
(Currently not used.) |
| 50 |
59 |
10 |
Journal Reference Line |
(W/O Number for W/O Based
Systems.) |
| 60 |
89 |
30 |
Line Description |
(W/O Description for W/O
Based Systems.) |
| 90 |
104 |
15 |
Amount |
-99999999999.99 |
| 105 |
112 |
8 |
Operator Id |
(MUST Be a Valid Alpha Username.) |
| 113 |
113 |
1 |
Open Item Status |
(Currently not used.) |
|
Back to index...
UCRFS Feeder System File
Requirements - Budgetary
Filename: Three (3) character Source concatenated with an eight digit
date (MMDDYYYY) and a variable length user defined sequence number.
The date will be the date the file was produced. The file extension
will be "txt". Example: File submitted by Physical Plant on
February 24, 2000, sequence number 49 would have the filename "php0224200049.txt".
If you want to replace a file before it has been processed, submit
a new file with the same name. If you want to submit an additional file
on the same day, the file should have a different sequence number.
File will be ASCII type and transferred via FTP as ASCII.
All dates will be in the format MMDDYYYY with leading zeros. Example:
02032000
All fields except the Amount field will be left justified. Carriage
return and line feed characters are NOT allowed within the data fields.
The Amount field will be right justified. The negative sign must immediately
precede the leading digit. Example: -89.01
The Journal Header record must be followed by its corresponding Journal
Line records. The first field of the Journal Header record is a delimiter
field and must contain the value "H". The first field of the
Journal Line record is a delimiter field and must contain the value
"L". Each ledger, TEMP and PERM must balance.
Back to index...
| Journal Header |
|
Journal Line
|
| Positions |
Length |
Field Name |
Comments |
| 1 |
1 |
1 |
Delimiter |
H (Must contain the value "H") |
| 2 |
4 |
3 |
Source |
BEA |
| 5 |
12 |
8 |
Extract Date |
|
| 13 |
13 |
1 |
Type Entry |
B |
| 14 |
14 |
1 |
Adjusting Entry |
(Currently not used.) |
| 15 |
22 |
8 |
Journal Date |
(Used to derive Posting Period Derived;
7/31 = Period 1) |
| 23 |
276 |
254 |
Descr254 |
(See notes below) |
Notes:
- All fields values are mandatory except as noted.
- Journal Date will be used to post the journal to the appropriate
budget year and accounting period. Example: A journal date of
08032000 will be posted to the budget year 2001, accounting
period 2.
|
|
| Positions |
Length |
Field Name |
Comments |
| 1 |
1 |
1 |
Delimiter |
L (Must contain the value
"L") |
| 2 |
7 |
6 |
Account |
(Must be at the budget category
level) |
| 8 |
17 |
10 |
Activity |
(6 characters currently used.) |
| 18 |
22 |
5 |
Fund Code |
|
| 23 |
27 |
5 |
Function |
(2 characters currently used.) |
| 28 |
32 |
5 |
Cost Center |
(Currently not used.) |
| 33 |
47 |
15 |
Project Code |
(Currently not used.) |
| 48 |
49 |
2 |
Project Code Corporate |
(Currently not used.) |
| 50 |
59 |
10 |
Journal Reference Line |
(W/O Number for W/O Based
Systems.) |
| 60 |
89 |
30 |
Line Description |
(W/O Description for W/O
Based Systems.) |
| 90 |
104 |
15 |
Amount |
-99999999999.99 |
| 105 |
112 |
8 |
Operator Id |
(Currently not used.) |
| 113 |
113 |
1 |
Open Item Status |
(Currently not used.) |
| 114 |
114 |
1 |
Transaction Class |
A or I (Only used for PERM
ledgers) |
| 115 |
116 |
2 |
Transaction Type |
(Only used for PERM ledgers) |
| 117 |
121 |
4 |
Ledger |
TEMP or PERM |
|
Back to index...
|